Home > Products > Structural Pipe > Hot Finished Structural Hollow Section Non-Alloy Steel Tube

Hot Finished Structural Hollow Section Non-Alloy Steel Tube

  • $600
    ≥5
    Ton
Payment Type:
L/C,T/T,D/P,Paypal,Money Gram,Western Union
Incoterm:
FOB,CFR,CIF,FCA,CPT
Min. Order:
5 Ton
Transportation:
Ocean,Land,Air
Port:
Shanghai,Ningbo
Share:
Chat Now
  • Product Description
Overview
Product Attributes

Model No.EN10210

BrandTORICH

StandardDIN EN10210

TechnicsHot Rolled

AlloyNon-alloy

TechniqueHot Rolled

Length3-12m

UsageStructure Pipe

SurfaceSmooth And Oiled

ShapeSquare, Rectangular, Round

GradeS235JRH, S355J2H Etc

OD6-140 Mm

WT0.4-12 Mm

Key WordsStructural Seel Tube

Supply Ability & Additional Information

PackagingStructural Seel Tubes are packed in wooden boxes or hexagonal bundles in seaworthy packing.

Productivity20000 tons/year

TransportationOcean,Land,Air

Place of OriginChina (Zhejiang)

Supply Ability5000Tons per Year

CertificateISO9001,ISO14001,TS16949

PortShanghai,Ningbo

Payment TypeL/C,T/T,D/P,Paypal,Money Gram,Western Union

IncotermFOB,CFR,CIF,FCA,CPT

Packaging & Delivery
Selling Units:
Ton
Package Type:
Structural Seel Tubes are packed in wooden boxes or hexagonal bundles in seaworthy packing.

TORICH EN10210 Hot Finished Structural Hollow Section of Non-Alloy Steel Tube

Product Description:

OD: 6-140mm

WT: 0.4-12mm

Length: 3-12m

DIN EN 10210-1:
Hot finished structural hollow sections of non-alloy and fine grain steels

Cold forming:
Process is done at ambient temperature
Structural hollow section manufacturing process:
Structural hollow sections are manufactured by seamless or by welding.
Welded sections manufactured by continuous process.
Electric welded hollow sections are supplied without trimming the internal weld bead.
Delivery condition:
Qualities JR, J0, J2 and K2 - Hot finished
Qualities N and NL - normalized. (normalized rolled)
- for accelerated cooling +DC
- for quenching and tempering +QT
Surface condition:
The hollow sections have a smooth surface corresponding to the manufacturing method used; bumps, cavities or shallow longitudinal grooves resulting from the manufacturing process are permissible, provided the thickness is within tolerance.
End: Square cut

structural pipestructural tubestructural tubes

Reference Standard:
Part 1: Technical delivery conditions
Part 2: Tolerances, dimensions and sectional properties

EN 287-1, Qualification test of welders - Fusion welding - Part 1: Steels

EN 10002-1, Metallic materials - Tensile testing - Part 1: Method of test at ambient temperature EN 10020:2000, Definition and classification of grades of steel

EN 10021:1993, General technical delivery requirements for steel and iron products

EN 10027-1, Designation systems for steels - Part 1: Steel names

EN 10027-2, Designation systems for steels - Part 2: Numerical system

EN 10045-1, Metallic materials - Charpy impact test - Part 1: Test method

EN 10052:1993, Vocabulary of heat treatment terms for ferrous products

EN 10168, Steel products - Inspection documents - List of information and description

EN 10204, Metallic products - Types of inspection documents

QUALITY CONTROL:

1. Incoming Raw Material Inspection
2. Raw Material Segregation to avoid steel grade mix-up
3. Heating and Hammering End for Cold Drawing
4. Cold Drawing and Cold Rolling, on line inspection
5. Heat Treatment, +A, +SRA, +LC, +N, Q+T
6. Straightening-Cutting to specified length-Finished Measuring Inspection
7. Machanical Testing in own labs with Tensile Strength, Yield Strength, Elongation, Hardness, Impact, Mictrostruture etc
8. Packing and Stocking

100% of our steel tubes are dimensionally checked
100% of our steel tubes are visually checked to assure they have a perfect surface condition and no surface defects.
100% eddy current test and ultrosonic test to eliminate longitudinal and transversal defects.

FAQ:

Q: Are you trading company or manufacturer ?

A: A professional steel pipes materials inventor, manufacturer and solution provider

Q: How long is your delivery time?

A: Generally it is 7-14 days if the goods are in stock. or it is 30-60 days if the goods are not in stock, it is according to quantity.

Q: Do you provide samples of carbon seamless steel tube ? is it free or extra ?

A: Yes, we could offer the sample for free charge but need pay the cost of freight.

Q: What is your terms of payment ?

A: Payment<=1000USD, 100% in advance. Payment>=1000USD, 30% T/T in advance ,balance before shippment.
If you have another question, pls feel free to contact us 

TORICH EN10210 Hot Finished Structural Hollow Section of Non-Alloy Steel Tube



Product Categories : Structural Pipe

Home > Products > Structural Pipe > Hot Finished Structural Hollow Section Non-Alloy Steel Tube
Email to this supplier
  • *Subject:
  • *To:
    Mr. Richard SHEN
  • *Email:
  • *Message:
    Your message must be between 20-8000 characters
Send Inquiry
*
*

Related Products List

Home

Product

Whatsapp

About Us

Inquiry

We will contact you immediately

Fill in more information so that we can get in touch with you faster

Privacy statement: Your privacy is very important to Us. Our company promises not to disclose your personal information to any external company with out your explicit permission.

Send