Privacy statement: Your privacy is very important to Us. Our company promises not to disclose your personal information to any external company with out your explicit permission.
Model No.: GB/T8162-2008
Brand: Torich
Type: Seamless
Certification: UL
Application: Drill Pipe
Section Shape: Round
Surface Treatment: Polished
Usage: Construction & Decoration
Technique: Cold Drawn
Material: Carbon Steel
OD:: 20-300mm
WT:: 5-50mm
Length:: 5-12m
Packaging: Package in wooden box
Productivity: 50000 tons
Transportation: Ocean,Land,Air
Place of Origin: China
Supply Ability: 20 tons
Certificate: ISO9001,ISO14001,TS16949
HS Code: 730419000
Port: Ningbo,Shanghai
Payment Type: L/C,T/T,D/P,Paypal,Money Gram,Western Union
Incoterm: FOB,CFR,CIF,EXW,FCA,CPT
TORICH Seamless Carbon GB/T8162-2008 Boiler Tube Heavy Thick Wall Steel Pipe
Material | 45# 16Mn 35# 20# 10# 40Cr 20Cr 20CrMo 20CrMnTi 40MnMoV 42CrMo 10Mn2 15Cr 30CrMnSi |
Stanard | GB/T8162 8163 ASTM A500 ASTM A501 JIS G3441 JIS G3444 ASTM A53 DIN1629 GOST8734-75 |
Tolerance | The common difference of inner diameter could be controlled i the scope of 0.1mm |
Heat Treatment | Annealing, Quenching and tempering, Hot rolled |
Surface | Pickling and Phosphating |
2.Production process:
Cold drawn tubes from perforated pipe,to meet your requests.
3.Main Features:
Lower costs of producing sleeve than doing by Steel Bar,and have better performance on your usage.
4.Main Application:
sleeve,in construction, mechanical purpose, drill pipe, automotive part.
5.Our products are widely used in:
General and mechanical structure,contruction and liquid conveyance.
6.Tolerances:
OD:
20-300mm
WT:
5-50mm
Length:
5-12m
7.Keywords:
Automotive Pipes, Astm Pipes, Drill Pipes, Mechanical Pipes, Pipes for engine, Construction Pipes.
Product Show
QUALITY CONTROL:
1. Incoming Raw Material Inspection
2. Raw Material Segregation to avoid steel grade mix-up
3. Heating and Hammering End for Cold Drawing
4. Cold Drawing and Cold Rolling, on line inspection
5. Heat Treatment, +A, +SRA, +LC, +N, Q+T
6. Straightening-Cutting to specified length-Finished Measuring Inspection
7. Machanical Testing in own labs with Tensile Strength, Yield Strength, Elongation, Hardness, Impact, Mictrostruture etc
8. Packing and Stocking
100% of our steel tubes are dimensionally checked
100% of our steel tubes are visually checked to assure they have a perfect surface condition and no surface defects.
100% eddy current test and ultrosonic test to eliminate longitudinal and transversal defects.
Q: Are you trading company or manufacturer ?
A: A professional steel pipes materials inventor, manufacturer and solution provider
Q: How long is your delivery time?
A: Generally it is14-25 days if the goods are in stock. or it is 45-60 days if the goods are not in stock, it is according to quantity.
Q: Do you provide samples of carbon seamless steel tube ? is it free or extra ?
A: Yes, we could offer the sample for free charge but need pay the cost of freight.
Q: What is your terms of payment ?
A: FOB CFR CIF EXW
Product Categories : Seamless Steel Tubes
Privacy statement: Your privacy is very important to Us. Our company promises not to disclose your personal information to any external company with out your explicit permission.
Fill in more information so that we can get in touch with you faster
Privacy statement: Your privacy is very important to Us. Our company promises not to disclose your personal information to any external company with out your explicit permission.