Home > Products > Seamless Steel Tubes > BS6323 CFS 3/CFS 3A Seamless DOM Steel Tube

BS6323 CFS 3/CFS 3A Seamless DOM Steel Tube

  • $1200
    ≥5
    Ton
Payment Type:
L/C,T/T,D/P,Paypal,Money Gram,Western Union
Incoterm:
FOB,CFR,CIF,FCA,CPT
Min. Order:
5 Ton
Transportation:
Ocean,Land,Air
Port:
Shanghai,Ningbo
Share:
Chat Now
  • Product Description
Overview
Product Attributes

Model No.BS 6323

BrandTORICH

StandardBS 6323

TechnicsCold Drawn

AlloyNon-alloy

ShapeRound Shape

End ProtectorPlastic Pipe Cap

SurfaceCustomers't Requirement

MaterialCFS 3, CFS 3A, CFS 4 Etc

KeywordDOM Steel Tubes

OD5-220 Mm

WT0.5 - 25 Mm

LengthMax 7000mm

Supply Ability & Additional Information

PackagingDOM Seel Tubes are packed in wooden boxes or hexagonal bundles in seaworthy packing.

Productivity20000 tons/year

TransportationOcean,Land,Air

Place of OriginChina (Zhejiang)

Supply Ability5000Tons per Year

CertificateISO9001,ISO14001,TS16949

PortShanghai,Ningbo

Payment TypeL/C,T/T,D/P,Paypal,Money Gram,Western Union

IncotermFOB,CFR,CIF,FCA,CPT

Packaging & Delivery
Selling Units:
Ton
Package Type:
DOM Seel Tubes are packed in wooden boxes or hexagonal bundles in seaworthy packing.

TORICH BS 6323-4 CFS 3/ CFS 3A/ CFS 4 Round Seamless DOM Steel Tube

Product Description:

OD: 5-220 mm

WT: 0.5-25mm

Length: Max 7000mm

Delivery Condition:

1 BK        Cold finished(hard)

2 BKW    Cold finished(soft)

3 GBK     Annealed

4 NBK     Normalized

5 GZF      Annealed (including de-scaling)

6 NZF      Normalized (including de-scaling)

20171108145846_3502720171108145918_3652520171108145958_84910

DOM Steel Tube Production Process:

Raw material → Incoming inspection  → Cutting  → Heating  → Piercing  → Hammering  →Pickling  → Cold-drawing  → Heat treatment  → Physical chemistry test → Straightening  → Ends cutting  → Final inspection  → Bundling  →Storage

QUALITY CONTROL:

1. Incoming Raw Material Inspection
2. Raw Material Segregation to avoid steel grade mix-up
3. Heating and Hammering End for Cold Drawing
4. Cold Drawing and Cold Rolling, on line inspection
5. Heat Treatment, +A, +SRA, +LC, +N, Q+T
6. Straightening-Cutting to specified length-Finished Measuring Inspection
7. Machanical Testing in own labs with Tensile Strength, Yield Strength, Elongation, Hardness, Impact, Mictrostruture etc
8. Packing and Stocking


 

100% of our steel tubes are dimensionally checked
100% of our steel tubes are visually checked to assure they have a perfect surface condition and no surface defects.
100% eddy current test and ultrosonic test to eliminate longitudinal and transversal defects.

FAQ:

Q: Are you trading company or manufacturer ?

A: A professional steel pipes materials inventor, manufacturer and solution provider

Q: How long is your delivery time?

A: Generally it is 7-14 days if the goods are in stock. or it is 30-60 days if the goods are not in stock, it is according to quantity.

Q: Do you provide samples of carbon seamless steel tube ? is it free or extra ?

A: Yes, we could offer the sample for free charge but need pay the cost of freight.

Q: What is your terms of payment ?

A: Payment<=1000USD, 100% in advance. Payment>=1000USD, 30% T/T in advance ,balance before shippment.
If you have another question, pls feel free to contact us 

TORICH BS 6323-4 CFS 3/ CFS 3A/ CFS 4 Round Seamless DOM Steel Tube

Product Categories : Seamless Steel Tubes

Home > Products > Seamless Steel Tubes > BS6323 CFS 3/CFS 3A Seamless DOM Steel Tube
Email to this supplier
  • *Subject:
  • *To:
    Mr. Richard SHEN
  • *Email:
  • *Message:
    Your message must be between 20-8000 characters
Send Inquiry
*
*

Related Products List

Home

Product

Whatsapp

About Us

Inquiry

We will contact you immediately

Fill in more information so that we can get in touch with you faster

Privacy statement: Your privacy is very important to Us. Our company promises not to disclose your personal information to any external company with out your explicit permission.

Send