Privacy statement: Your privacy is very important to Us. Our company promises not to disclose your personal information to any external company with out your explicit permission.
Model No.: ASTM A213
Brand: Torich
Standard: Bs, Gb, Astm, Jis, Din, Api
Section Shape: Round
Place Of Origin: China
Application: Boiler Pipe
Certification: Bsi, Ce, Ul, Api
Whether Alloy: Is Alloy
Tolerance: ±5%
Category: Welded Steel Pipe
Processing Service: Bending, Welding, Decoiling, Punching, Cutting
Product Name: Astm A213 T5 Alloy Steel Tube For Boiler
Keyword: Alloy Steel Tubes
OD: 5-420mm
WT: 0.5-50mm
Length: Max12000mm
Grade/Material: T5
Secondary Or Not: Non-Secondary
Application: For Boiler Pipes And Heat Exchangers
Packaging: In hexagonal bundles or wooden box
Productivity: 50000 ton per year
Transportation: Ocean,Land,Air
Place of Origin: CHINA
Supply Ability: 50000 ton per year
Certificate: ISO9001, ISO14001, TSI16949
HS Code: 7304319000
Port: Ningbo,Shanghai
Payment Type: L/C,T/T,D/P,Paypal,Money Gram,Western Union
Incoterm: FOB,CFR,CIF,EXW,FCA,CPT,CIP
Application: For boiler pipes and heat exchangers
Steel Grade/Steel Material: T5
Size Range:
OD | 5-420mm |
WT | 0.5-50mm |
Length | According to customer requirement |
Characteristic:
Good concentricity
Good OD and ID tolerance
High Precision
Stable quality
Smooth Roughness
TORICH QUALITY ASSURANCE
Chemical Composition:
Grade | UNS | C, % | Mn, % | P, % | S, % | Si, % | Cr, % | Mo, % |
T5 | K41545 | 0.15 max | 0.30-0.60 | 0.025 max | 0.025 max | 0.50 max | 4.00-6.00 | 0.45-0.65 |
Mechanical Proporties:
Tensile Strength , MPa | Yield Strength, MPa | Elongation, % | Hardness, HB |
415 min | 205 min | 30 min | 163 max |
Outside Diameter and Tolerance:
Outside Diameter | OD Tolerance | WT Tolerance | Ovality Tolerance | Cut Length Tolerance |
OD≤ 12, 7 mm | ± 0, 13 mm | ± 15 % | – | + 3, 18 mm, – 0 mm |
12, 7 mm < OD ≤ 38, 1 mm | ± 0, 13 mm | ± 10 % | max, 1, 65 mm | + 3, 18 mm, – 0 mm |
38, 1 mm < OD ≤ 88, 9 mm | ± 0, 25 mm | ± 10 % | max, 2, 41 mm | + 4, 76 mm, – 0 mm |
Product show:
FAQ:
A: A professional steel pipes materials inventor, manufacturer and solution provider
A: Generally it is 7-14 days if the goods are in stock. or it is 30-60 days if the goods are not in stock, it is according to quantity.
A: Yes, we could offer the sample for free charge but need pay the cost of freight.
A: Payment<=1000USD, 100% in advance. Payment>=1000USD, 30% T/T in advance ,balance before shippment.
If you have another question, pls feel free to contact us
Product Categories : Seamless Boiler Steel Tubes
Privacy statement: Your privacy is very important to Us. Our company promises not to disclose your personal information to any external company with out your explicit permission.
Fill in more information so that we can get in touch with you faster
Privacy statement: Your privacy is very important to Us. Our company promises not to disclose your personal information to any external company with out your explicit permission.