Home > Products > DOM Steel Tubes > TORICH BS6323-6 Cold Finished ERW DOM Steel Tube

TORICH BS6323-6 Cold Finished ERW DOM Steel Tube

  • $600
    ≥5
    Ton
Payment Type:
L/C,T/T,D/P,Paypal,Money Gram,Western Union
Incoterm:
FOB,CFR,CIF,FCA,CPT
Min. Order:
5 Ton
Transportation:
Ocean,Land,Air
Port:
Shanghai,Ningbo
Share:
Chat Now
  • Product Description
Overview
Product Attributes

Model No.BS6323-6

BrandTORICH

StandardBS6323-6

TechnicsCold Drawn

AlloyNon-alloy

ShapeRound

ApplicationAuto Industry

KeywordDOM STEEL TUBE

OD6-350mm

SurfaceOiled

LengthMax 12000mm

WT1-35mm

GradeCEW1a CEW2a CEW3a CEW4a CEW5a

Supply Ability & Additional Information

PackagingDOM Steel Tubes are packed in wooden boxes or hexagonal bundles in seaworthy packing.

Productivity20000 tons/year

TransportationOcean,Land,Air

Place of OriginChina (Zhejiang)

Supply Ability5000Tons per Year

CertificateISO9001,ISO14001,TS16949

PortShanghai,Ningbo

Payment TypeL/C,T/T,D/P,Paypal,Money Gram,Western Union

IncotermFOB,CFR,CIF,FCA,CPT

Packaging & Delivery
Selling Units:
Ton
Package Type:
DOM Steel Tubes are packed in wooden boxes or hexagonal bundles in seaworthy packing.

TORICH BS6323-6 Cold Finished Electric Resistance Welded DOM Steel Tube

Product Description:

StandardBS6323-6

Size Range:  OD: 6-350mm
                       WT: 1-35mm

                       Length: max 12000mm

Steel GradeCEW1a CEW2a CEW3a CEW4a CEW5a

Delivery Condition:

1 BK        Cold finished(hard)

2 BKW    Cold finished(soft)

3 GBK     Annealed

4 NBK     Normalized

5 GZF      Annealed (including de-scaling)

6 NZF      Normalized (including de-scaling)


Product Pictures:

IMG_0532PIC_20161202_150109_47C

Packing:

Steel Tube Container PackingPacking In Hexagon Bundle

 

Characteristic:

Good concentricity

Good OD and ID tolerance

High precision

Stable quality

Smooth roughness

 

DOM Steel Tube Production Process:

Raw material → Incoming inspection  → Cutting  → Heating  → Piercing  → Hammering  →Pickling  → Cold-drawing  → Heat treatment  → Physical chemistry test → Straightening  → Ends cutting  → Final inspection  → Bundling  →Storage


Torich's Chemical assurance
1.Each lot of raw materials will be tested by spectrometer before put in storage.
2.100%PMI the mother pipe to ensure we put right material.
2.100%PMI the finished pipe again to ensure we produced right grade

Heat Treatment Assurance

A full-automatic natural gas furnace with 24 meters in length.The real temperature tolerance could be within 10℃.



FAQ

Q: Are you trading company or manufacturer ?

A: A professional steel pipes materials inventor, manufacturer and solution provider

Q: How long is your delivery time?

A: Generally it is 7-14 days if the goods are in stock. or it is 30-60 days if the goods are not in stock, and it is according to quantity.

Q: Do you provide samples ? is it free or extra ?

A: Yes, we could offer the sample for free charge but you need to pay the cost of freight.

Q: What is your terms of payment ?

A: Payment<=1000USD, 100% in advance. Payment>=1000USD, 30% T/T in advance , balance before shippment.
If you have another question, pls feel free to contact us

TORICH BS6323-6 Cold Finished Electric Resistance Welded DOM Steel Tube



Product Categories : DOM Steel Tubes

Home > Products > DOM Steel Tubes > TORICH BS6323-6 Cold Finished ERW DOM Steel Tube
Email to this supplier
  • *Subject:
  • *To:
    Mr. Richard SHEN
  • *Email:
  • *Message:
    Your message must be between 20-8000 characters
Send Inquiry
*
*

Related Products List

Home

Product

Whatsapp

About Us

Inquiry

We will contact you immediately

Fill in more information so that we can get in touch with you faster

Privacy statement: Your privacy is very important to Us. Our company promises not to disclose your personal information to any external company with out your explicit permission.

Send