Company Details
  • Torich International Co.,Ltd--The Steel Tube Maker

  •  [Zhejiang,China]
  • Business Type:Distributor/Wholesaler , Manufacturer , Service , Trade Company
  • Main Mark: Africa , Americas , Asia , Caribbean , East Europe , Europe , Middle East , North Europe , Oceania , Other Markets , West Europe , Worldwide
  • Exporter:31% - 40%
  • Certs:GB, ISO9001, ISO14001
  • Description:BS6323-4 Cold Finished,Seamless Steel Tube,Grade CFS1 CFS2 CFS3
Torich International Co.,Ltd--The Steel Tube Maker BS6323-4 Cold Finished,Seamless Steel Tube,Grade CFS1 CFS2 CFS3
Home > Products > Seamless Steel Tubes > BS6323-4 Cold Finished Seamless Steel Tube With Grade CFS1 CFS2 CFS3 CFS4 CFS5 42CrMo4

BS6323-4 Cold Finished Seamless Steel Tube With Grade CFS1 CFS2 CFS3 CFS4 CFS5 42CrMo4

Share to:  
    Payment Type: L/C,T/T,D/P,Paypal,Money Gram,Western Union
    Incoterm: FOB,CFR,CIF,FCA,CPT
    Min. Order: 5 Metric Ton
    Delivery Time: 30 Days

Basic Info

Model No.: BS6323-4

Shape: Round

Surface Treatment: Mill Finished

Grade: 6000 Series

Alloy: Non-alloy

Temper: T3 - T8

Additional Info

Packaging: In Wooden boxes

Productivity: 20000 Ton per year

Brand: TORICH

Transportation: Ocean,Land,Air

Place of Origin: CHINA

Supply Ability: 50000 Tons per year

Certificate: ISO 9001-2008 TS16949 ISO 14001 NK RINA

Port: ShangHai,NingBo

Product Description

BS6323-4 Cold Finished Seamless Steel Tube With Grade CFS1 CFS2 CFS3 CFS4 CFS5 42CrMo4

Standard: BS6323-4 Seamless and Welded steel tubes for automobile,mechanical and general engineering purposes
Part 4: Specific requirements for cold finished Seamless Steel Tubes


Applications: for Auto industry / for machinery use/mechanical and general engineering purposes

Size range: O.D.:6-280mm W.T.:1-30mm L:max12000mm

Method of manufacture:

The tubes are manufactured by a seamless process and shall be cold finished

It is permissible for cold finished tubes to have on internal and external surfaces an adherent layer of residual to subsequent processing, then their removal shall be the subject of an agreement between the manufacturer and the purchaser.

Delivery Condition:

The tubes are supplied in one of the following condition:

a. Cold finished/hard (cold finished as drawn) : BK

b. Cold finished/soft (lightly cold worked ): BKW

c. Annealed: GBK

d. Annealed (including de-scaling): GZF

e. Normalized: NBK

f. Normalized ( including de-scaling): NZF

Tests:

Flattenning tests

Leak tightness test- Eddy current test

Design
ation

Chemical Compositions( ladle analysis)

C

Si

Mn

Pmax.

Smax.

Cr

Mo

%

%

%

%

%

%

%

CFS 3

0.20 max.

0.35 max.

0.90max.

0.050

0.050

__

__

CFS 3Aa

0.20 max.

0.10 to 0.35

0.60 to 1.00

0.050

0.050

__

__

CFS 4

0.25 max.

0.35 max.

1.20 max.

0.050

0.050

__

__

CFS 5b

0.23 max.

0.50 max.

1.50 max.

0.050

0.050

__

__

CFS 6

0.30 to0.40

0.35 max.

0.50 to 0.90

0.050

0.050

__

__

CFS 7

0.20 to 0.30

0.35 max.

1.20 to1.50

0.050

0.050

__

__

CFS 8d

0.40 to 0.55

0.35 max.

0.50 to0.90

0.050

0.050

__

__

CFS 9

0.29max.

0.35 max.

1.50max.

0.050

0.050

__

0.15 to0.25

CFS 10

0.26max.

0.35 max.

0.80max.

0.050

0.050

0.80 to1.20

0.15 to0.30

CFS 11

0.45max.

0.35 max.

1.00 max.

0.050

0.050

0.80 to1.20

0.15 to0.30

Torich A333 A333m Gr1 Gr2 Gr3 Gr4Torich A333 A333m Gr1 Gr2 Gr3 Gr4 2

Q: Are you trading company or manufacturer ?

A: A professional steel pipes materials inventor, manufacturer and solution provider

Q: How long is your delivery time?

A: Generally it is 7-14 days if the goods are in stock. or it is 30-60 days if the goods are not in stock, it is according to quantity.

Q: Do you provide samples of Seamless steel tube ? is it free or extra ?

A: Yes, we could offer the sample for free charge but need pay the cost of freight.

Q: What is your terms of payment ?

A: Payment<=1000USD, 100% in advance. Payment>=1000USD, 30% T/T in advance ,balance before shippment.
If you have another question, pls feel free to contact us

BS6323-4 Cold Finished Seamless Steel Tube With Grade CFS1 CFS2 CFS3 CFS4 CFS5 42CrMo4

Looking for ideal BS6323-4 Cold Finished Manufacturer & supplier ? We have a wide selection at great prices to help you get creative. All the Seamless Steel Tube are quality guaranteed. We are China Origin Factory of Grade CFS1 CFS2 CFS3. If you have any question, please feel free to contact us.

Product Categories : Seamless Steel Tubes

Product Images
  • BS6323-4 Cold Finished Seamless Steel Tube With Grade CFS1 CFS2 CFS3 CFS4 CFS5 42CrMo4
  • BS6323-4 Cold Finished Seamless Steel Tube With Grade CFS1 CFS2 CFS3 CFS4 CFS5 42CrMo4
  • BS6323-4 Cold Finished Seamless Steel Tube With Grade CFS1 CFS2 CFS3 CFS4 CFS5 42CrMo4
  • BS6323-4 Cold Finished Seamless Steel Tube With Grade CFS1 CFS2 CFS3 CFS4 CFS5 42CrMo4
  • BS6323-4 Cold Finished Seamless Steel Tube With Grade CFS1 CFS2 CFS3 CFS4 CFS5 42CrMo4
Email to this supplier
  • *Subject:
  • *Messages:
    Your message must be between 20-8000 characters
Copyright © 2018 Torich International Co.,Ltd--The Steel Tube Maker All rights reserved.
Communicate with Supplier?Supplier
Richard SHEN Mr. Richard SHEN
What can I do for you?