Company Details
  • Torich International Co.,Ltd--The Steel Tube Maker

  •  [Zhejiang,China]
  • Business Type:Distributor/Wholesaler , Manufacturer , Service , Trade Company
  • Main Mark: Africa , Americas , Asia , Caribbean , East Europe , Europe , Middle East , North Europe , Oceania , Other Markets , West Europe , Worldwide
  • Exporter:31% - 40%
  • Certs:GB, ISO9001, ISO14001
  • Description:ASTM A192,Seamless Carbon,Steel Boiler Tubes
Torich International Co.,Ltd--The Steel Tube Maker ASTM A192,Seamless Carbon,Steel Boiler Tubes
Home > Products > Seamless Steel Tubes > ASTM A192 Seamless Carbon Steel Boiler Tubes For High Pressure Boilers

ASTM A192 Seamless Carbon Steel Boiler Tubes For High Pressure Boilers

Share to:  
    Payment Type: L/C,T/T,D/P,Paypal,Money Gram,Western Union
    Incoterm: FOB,CFR,CIF,FCA,CPT
    Min. Order: 5 Metric Ton
    Delivery Time: 30 Days

Basic Info

Model No.: ASTM A192

Shape: Round

Surface Treatment: Mill Finished

Grade: 6000 Series

Alloy: Non-alloy

Temper: T3 - T8

Additional Info

Packaging: In Wooden boxes

Productivity: 20000 Ton per year

Brand: TORICH

Place of Origin: CHINA

Supply Ability: 50000 Tons per year

Certificate: ISO 9001-2008 TS16949 ISO 14001 NK RINA

Port: ShangHai,NingBo

Product Description

ASTM A192 Seamless Carbon Steel Boiler Tubes for High Pressure Boilers


Material: Carbon Steel

Production: Tubes are manufactured by seamless process and both hot finished and cold finished are applicable.

Size range: O.D.: 12.7-177.8mm W.T.: 1-25.4mm L: according to customer requirement

Applications:

for Boilers,Superheaters,

Heat-Exchangers,

High-pressure Boilers,

Steam Boilers

Cold Condensers and High-Pressure Services,

High-Temperature Services for Boiler Constructions

Heat treatment:
Hot finished tubes need not be heat treated.

Cold Finished tubes are heat treated after the final cold finishing pass at a temperature of 1200℉(650℃) or higher

Steel Grade and Chemical Compositions:

C 0.06-0.18
Mn 0.27-0.63
P ≤0.035
S ≤0.035
Si ≤0.25

Mechanical Properties
Tensil Streghth: min ksi[Mpa] 47[325]
Yield Point: min ksi[Mpa] 26[180]
Elongation: ≥35%

Hardness

Brinell Hardness Rockwell Hardness Number
WT≥0.200in(5.1mm) WT<0.200in(5.1mm)
137HRB 77HRB


Tests and Inspection:
Mechanical Testing:

Flattening Test

Flaring Test

Flange Test

Hardness Test

Hydrostatic Test

Characteristic:

High Creep Rupture Strength

High antioxidant properties

Good organizational stability

Good concentricity

Good OD and ID tolerance

High Precision

Stable quality

Smooth Roughness

TORICH QUALITY ASSURANCE

Processing:

RAW MATERIAL

INCOMING INSPECTION

STORAGE CUTTINGHAMMERINGPICKING LUBRICATIONCLEANING PHOSPHORI CLEAN

ENDS CUTTING←STRAIGHTENING←HEAT TREATMENT↔MIDDLLE CHECK↔ COLD DRAWING ← LUBRICATING

FINAL INSPECTION→BUNDING→STORAGE

Widely used in the field of:High pressure boiler

1~ Incoming Raw Material Inspection
2~ Raw Material Segregation to avoid steel grade mix-up
3~ Heating and Hammering End for Cold Drawing
4~ Cold Drawing and Cold Rolling, on line inspection
5~ Heat Treatment, +A, +SRA, +LC, +N, Q+T
6~ Straightening-Cutting to specified length-Finished Measuring Inspection
7~ Machanical Testing in own labs with Tensile Strength, Yield Strength, Elongation, Hardness, Impact, Mictrostruture etc
8~ Packing and Stocking.

100% of our steel tubes are dimensionally checked
100% of our steel tubes are visually checked to assure they have a perfect surface condition and no surface defects.
100% eddy current test and ultrosonic test to eliminate longitudinal and transversal defects.


Torich A333 A333m Gr1 Gr2 Gr3 Gr4Torich A333 A333m Gr1 Gr2 Gr3 Gr4 2

Q: Are you trading company or manufacturer ?

A: A professional steel pipes materials inventor, manufacturer and solution provider

Q: How long is your delivery time?

A: Generally it is 7-14 days if the goods are in stock. or it is 30-60 days if the goods are not in stock, it is according to quantity.

Q: Do you provide samples of Seamless steel tube ? is it free or extra ?

A: Yes, we could offer the sample for free charge but need pay the cost of freight.

Q: What is your terms of payment ?

A: Payment<=1000USD, 100% in advance. Payment>=1000USD, 30% T/T in advance ,balance before shippment.
If you have another question, pls feel free to contact us

Custom High Temperature Seamless Carbon Steel Pipe With ASTM A106 GrB

Looking for ideal ASTM A192 Manufacturer & supplier ? We have a wide selection at great prices to help you get creative. All the Seamless Carbon are quality guaranteed. We are China Origin Factory of Steel Boiler Tubes. If you have any question, please feel free to contact us.

Product Categories : Seamless Steel Tubes

Product Images
  • ASTM A192 Seamless Carbon Steel Boiler Tubes For High Pressure Boilers
  • ASTM A192 Seamless Carbon Steel Boiler Tubes For High Pressure Boilers
  • ASTM A192 Seamless Carbon Steel Boiler Tubes For High Pressure Boilers
  • ASTM A192 Seamless Carbon Steel Boiler Tubes For High Pressure Boilers
  • ASTM A192 Seamless Carbon Steel Boiler Tubes For High Pressure Boilers
Email to this supplier
  • *Subject:
  • *Messages:
    Your message must be between 20-8000 characters
Copyright © 2018 Torich International Co.,Ltd--The Steel Tube Maker All rights reserved.
Communicate with Supplier?Supplier
Richard SHEN Mr. Richard SHEN
What can I do for you?