Communicate with Supplier? Supplier
Richard SHEN Mr. Richard SHEN
What can I do for you?
Chat Now Contact Supplier
 Tel:86-574-88255925 Email:sales@steel-tubes.com
Home > Products > Seamless Boiler Steel Tubes > Seamless Carbon Steel Tubes For High Pressure Boilers
Seamless Carbon Steel Tubes For High Pressure Boilers
Seamless Carbon Steel Tubes For High Pressure Boilers
Seamless Carbon Steel Tubes For High Pressure Boilers
Seamless Carbon Steel Tubes For High Pressure Boilers
  • Seamless Carbon Steel Tubes For High Pressure Boilers
  • Seamless Carbon Steel Tubes For High Pressure Boilers
  • Seamless Carbon Steel Tubes For High Pressure Boilers
  • Seamless Carbon Steel Tubes For High Pressure Boilers

Seamless Carbon Steel Tubes For High Pressure Boilers

    Payment Type: L/C,T/T,D/P,Paypal,Money Gram,Western Union
    Incoterm: FOB,CFR,CIF,FCA,CPT
    Min. Order: 5 Ton
    Delivery Time: 30 Days

Basic Info

Model No.: ASTM A192

Standard: ASTM, GB, ASTM A192

Technics: Cold Drawn

Alloy: Non-alloy

Keyword: Carbon Steel Boiler Tubes

Length: Customer Requirement

WT: 1-25.4 Mm

OD: 12.7-177.8 Mm

Material: 10# 20# Etc Carbon Steel

Usage: Boilers/Superheaters

Additional Info

Packaging: Steel Tubes are packed in wooden boxes or hexagonal bundles in seaworthy packing.

Productivity: 20000 tons/year

Brand: TORICH

Transportation: Ocean,Land,Air

Place of Origin: China (Zhejiang)

Supply Ability: 5000Tons per Year

Certificate: ISO9001,ISO14001,TS16949

Port: Shanghai,Ningbo

Product Description

Product Description

TORICH ASTM A192 Seamless Carbon Steel Boiler Tubes For High Pressure Boilers
Standard ASTM A192
Matrial 10# 20# etc Carbon Steel
Size OD: 12.7-177.8mm WT: 1-25.4mm Length: according to customer requirement
Application For Boilers,Superheaters, Heat-Exchangers, High-pressure Boilers
Production Tubes are manufactured by seamless process and both hot finished and cold finished are applicable
Heat treatment Hot finished tubes need not be heat treated.
Cold Finished tubes are heat treated after the final cold finishing pass at a temperature of 1200℉(650℃) or higher
Chemical Composition
C
0.06-0.18
Mn
0.27-0.63
P
≤0.035
S
≤0.035
Si
≤0.25
Mechanical Properties
Brinell Hardness
Rockwell Hardness Number
WT≥0.200 in (5.1mm)
WT≤0.200 in (5.1mm)
137 HRB
77HRB

Mechanical Properties Tests and Inspection

Tensil Streghth: min ksi[Mpa] 47[325] Flattening Test Flaring Test
Yield Point: min ksi[Mpa] 26[180] Flange Test Hardness Test
Elongation: ≥35% Hydrostatic Test


Production Show

pl20208156-astm_a192_seamless_carbon_steel_boiler_tubes_for_high_pressure_boilerspl20501526-remark



QUALITY CONTROL:

1. Incoming Raw Material Inspection

2. Raw Material Segregation to avoid steel grade mix-up
3. Heating and Hammering End for Cold Drawing
4. Cold Drawing and Cold Rolling, on line inspection
5. Heat Treatment, +A, +SRA, +LC, +N, Q+T
6. Straightening-Cutting to specified length-Finished Measuring Inspection
7. Machanical Testing in own labs with Tensile Strength, Yield Strength, Elongation, Hardness, Impact, Mictrostruture etc
8. Packing and Stocking


100% of our steel tubes are dimensionally checked
100% of our steel tubes are visually checked to assure they have a perfect surface condition and no surface defects.
100% eddy current test and ultrosonic test to eliminate longitudinal and transversal defects.


FAQ

Q: Are you trading company or manufacturer ?

A: A professional steel pipes materials inventor, manufacturer and solution provider

Q: How long is your delivery time?
A: Generally it is 7-14 days if the goods are in stock. or it is 30-60 days if the goods are not in stock, it is according to quantity.

Q: Do you provide samples of carbon seamless steel tube ? is it free or extra ?
A: Yes, we could offer the sample for free charge but need pay the cost of freight.

Q: What is your terms of payment ?
A: Payment<=1000USD, 100% in advance. Payment>=1000USD, 30% T/T in advance ,balance before shippment.

If you have another question, pls feel free to contact us

TORICH ASTM A192 Seamless Carbon Steel Boiler Tubes For High Pressure Boilers

Looking for ideal ASTM A192 Carbon Steel Tubes Manufacturer & supplier ? We have a wide selection at great prices to help you get creative. All the Carbon Steel Boiler Tube are quality guaranteed. We are China Origin Factory of Seamless Tubes For Boilers. If you have any question, please feel free to contact us.

Product Categories : Seamless Boiler Steel Tubes

Email to this supplier
  • Mr. Richard SHEN
  • Your message must be between 20-8000 characters

Related Products List

Home

Phone

Skype

Inquiry